The Hong Kong Institution of Engineers – Fire Division

Date & Time

26 Apr 2025    
08:45 - 12:00

Fee

$0.00

Event Type

Event

Programme Highlights

The Tseung Kwan O Desalination Plant is a key project aimed at enhancing Hong Kong’s water security by diversifying its water sources The project will provide the first stage of the proposed seawater desalination plant using reverse osmosis at Tseung Kwan O (TKO) Area 137. The plant will have a water production capacity at 135,000 cubic metres (m3) per day with provision for future expansion to the ultimate water production capacity up to 270,000 m3 per day. 

The Tseung Kwan O Desalination Plant, being a critical infrastructure facility, is equipped with comprehensive Fire Services Installations (FSI) to ensure safety and compliance with Hong Kong’s stringent fire safety regulations.

Point of Assembly/ Address

TKO MTR Station  Exit B1 at 0845 am

Fee

Free to charge

Registration & Enquiries

The technical visit is free of charge and prior registration is required. For HKIE members, please register below.  The organizers reserve the right to decline their application if no membership no. is submitted. 

Applications will be accepted on a first-come-first-serve basis. Successful registration will be notified individually.  The deadline of application is 4 April 2025. Members participating in the event shall be responsible for their own safety during the visit. The HKIE Fire Division will not accept liability for any accident, damage or injury caused to or by any participants during the visit. Participants are strongly advised to acquire their own insurance cover if necessary. 

For enquiry, please contact Ir KV Vong at 94620840 via Whatsapp message.

 

Fire Division Committee

Registration Information